Mower Preparation - Toro Z-Master Operator's Manual

Collection system for out front z - 48" mower
Table of Contents

Advertisement

Mower Preparation

Remove Recycler Baffles
1.
Tilt mower into the vertical position, refer to;
Tilting the Mower, page 14.
2.
Remove locknuts, carriage bolts and the
Recycler baffles from the mower (Fig. 1).
Note:
Save all hardware for use when
installing Recycler baffles.
3
2
Figure 1
1. Recycler baffle
2. Carriage bolt
Install Bagger and Discharge Baffles,
Latch and Spring
1.
Locate the left and right bagger baffles inside the
mower and secure with (6) 5/16–18 x 3/4"
(19 mm) carriage bolts, through from the bottom
of mower, and (6) 5/16" locknuts (Fig. 2).
2.
Locate the left and right discharge baffles inside
the mower and secure with (4) 5/16–18 x 3/4"
(19 mm) carriage bolts, through from the bottom
and inside of mower, and (4) 5/16"
locknut.(Fig. 2).
3.
Mount latch on chute and hold against rear of
mower. If holes are not drilled, mark, center
punch and drill two 17/64" (7 mm) holes in
mower for latch.(Fig. 2).
Note:
The mounting holes on the latch are
slotted. Ensure that you slide the latch
as far forward as possible.
1
3. Locknut
4.
Locate the latch on top of the mower and secure
with (2) 10–24 x 1/2" (13 mm) screws, through
from the bottom of mower, and (2) 10–24
locknut (Fig. 2).
2
3
1
Figure 2
1. Bagger baffle
2. Locknut 3/8"
3. Carriage bolt
5/16–18 x 3/4" (19 mm)
4. Discharge baffle
5.
Attach spring bracket below traction unit control
plate with existing rear center bolt, down from
the top, and locknut (Fig. 3). Hook chute spring
into bracket
1
3
Figure 3
1. Spring bracket
2. Existing bolt
Installation
4
3
5. Latch
6. Screw 10–24 x 1/2"
(13 mm)
7. Locknut 10–24
2
4
3. Existing locknut
4. Spring
3
7
4
5
6
5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents