Index - H3C S5830 Series Installation Manual

Hide thumbs Also See for S5830 Series:
Table of Contents

Advertisement

Index

A C E F G H I L P S T V
A
Accessing the IRF fabric to verify the
C
Configuration terminal
Configuring basic IRF
Connecting the console
Connecting the physical IRF
Connecting the power
Cooling
system,44
E
Examining the installation
F
Fan
failure,41
G
Grounding the
switch,20
H
Hardware compatibility
Hot swappable fan
trays,48
Hot swappable power
I
Installation
tools,6
Installing the switch in a 19-inch
configuration,40
problems,41
settings,39
cable,29
ports,40
cord,26
site,4
matrix,47
modules,47
rack,8
Installing/removing a fan
Installing/removing a power
Installing/removing an interface
Interface
cards,49
IRF fabric setup
flowchart,34
L
LEDs,56
P
Planning IRF fabric
Ports,50
Power module
failure,41
Powering on the
switch,33
S
S5830- 1 06S panel
S5830-52SC panel
Safety
recommendations,4
Setting terminal
parameters,30
Setting up the configuration
T
Technical
specifications,43
V
Verifying the
installation,28
58
tray,21
module,23
card,27
setup,35
views,2
views,1
environment,29

Advertisement

Table of Contents
loading

This manual is also suitable for:

S5830-52scS5830-106s

Table of Contents