Installing The Mounting Brackets, Chassis Rails, And Grounding Cable (For The S5830-52Sc) - H3C S5830 Series Installation Manual

Hide thumbs Also See for S5830 Series:
Table of Contents

Advertisement

Table 5 Minimum and maximum distances required between front and rear rack posts
Switch model
S5830-52SC
S5830-106S
Installing the mounting brackets, chassis rails, and grounding
cable (for the S5830-52SC)
The S5830-52SC switch provides one front mounting position (near the network ports) and one rear
mounting position (near the power modules), and two grounding points (one primary grounding point
with a grounding sign, and one auxiliary grounding point). You use the primary grounding point in most
cases. If the primary grounding point fails or is not suitable for the installation site, use the auxiliary
grounding point.
Figure 13 Identifying the mounting and grounding positions
(1) Rear mounting position
(3) Auxiliary grounding point
Attaching the mounting brackets and chassis rails to the switch chassis
Align the mounting brackets with the screw holes in the rear mounting position (see
1.
front mounting position (see
Use M4 screws (supplied with the switch) to fix the mounting brackets to the chassis.
2.
Installation method
Mounting brackets and
short slide rails (supplied
with the switch)
Mounting brackets and
long slide rails (optional)
Mounting brackets and
slide rails (supplied with
the switch)
Figure
15).
11
Minimum distance
between front and
rear rack posts
401 mm (15.79 in)
621 mm (24.45 in)
489 mm (19.25 in)
1 2
(2) Primary grounding point
(4) Front mounting position
Maximum distance
between front and
rear rack posts
654 mm (25.75 in)
874 mm (34.41 in)
993 mm (39.09 in)
3
4
Figure
14) or

Advertisement

Table of Contents
loading

This manual is also suitable for:

S5830-52scS5830-106s

Table of Contents