Accessories - Wilton 2221VS Operating Instructions & Parts Manual

20-inch vs drill press
Table of Contents

Advertisement

Optional Equipment
Coolant System Installation
1. Remove the large reservoir cover plate from the
machine base. Tap 1/4-20 threads in the 4 pilot holes.
Install the cover plate back onto the machine base.
2. Insert the pump into the opening, utilize the
screws from the small round cover plate to fasten the
pump to the base.
3. Position the power switch and valve bracket on the
spindle casting. Mark mounting hole locations and
drill holes. (Refer to Figure 8).
Note: Mount components near the lower edge of the
spindle casting. Do not mount componets above the
line shown in Figure 9.
4. Install the power switch and valve bracket with the
provided fastener hardware.
Figure: 8 Suggested installation
16
Power switch - mounting
plate flush with bottom
edge of spindle casting.
5. Install the 3/8-inch hose barb to the coolant pump.
If needed apply a light coat of pipe sealant or Teflon
tape to the threads to prevent leakage.
6. Mount the flow valve to the bracket, connect the
supply hose to the pump and valve, use hose clamps
at the ends.
7. Install the flexible nozzle to the flow valve.
8. Install the 1/2-inch hose barb to the worktable,
seal threads if needed. Connect the return hose.
9. Connect the power cord to a suitable source and
ground (refer to General Electrical Cautions).
10. Fill the reservoir with appropriate machining
coolant.
Figure 9: Installation Detail
Do not mount components
above this line.
Flow valve
mounting bracket.

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for Wilton 2221VS

This manual is also suitable for:

2223vs2232ac2234ac

Table of Contents