Parameters Setting - Baxi DUO-TECMAX+ Instruction Manual For Users And Fitters

Condensing gas wall-hung boilers
Hide thumbs Also See for DUO-TECMAX+:
Table of Contents

Advertisement

Available languages

Available languages

• Press
and
• Press
• Press
• Press
Further information concerning the parameters listed in the following table are supplied together with the required
accessories.
P01
Manufacturer information
Gas used
P02
00
P03
Hydraulic system
Programmable relay 1 settings (See SERVICE instructions)
00
01
02
03
04
P04
05
06-07
08
09
programming from remote control
10
11 - 12 - 13
Programmable relay 2 settings (See SERVICE instructions)
P05
P06
(See SERVICE Instructions)
P07..P09
Manufacturer information
Heating setpoint setting OT / RT
(Remote Control - Open Therm / Room Thermostat 230V~)
00
01
and PCB
02
Thermostat enable the gas boiler operates
P10
03
Remote Control):
Remote Control from the boiler.
(see Room Unit accessory manual, chapter "INSTALLER FUNCTIONS")
P11..P12
Manufacturer information
P13
Max. heating output (0-100%)
P14
DHW max. output (0-100%)
P15
Min. heating output (0-100%)
P16
00
01
P17
Pump overrun time in heating mode (01-240 minutes)
P18
Burner ignition delay in CH mode (00-10 minutes) - 00=10 seconds
P19
Manufacturer information
P20
Pump overrun time in DHW mode (seconds)
7651561.02 (1-03/16)
01
the setpoint is set by pressing the +/-
the setpoint is set by modifying the "ULt" parameter
the higher setpoint of the
36
P01" appears on the display alternated
00
00
01
02
04
00
--
00
--
80
100
00
00
03
03
07
30

Advertisement

Chapters

Table of Contents
loading

Table of Contents