Chimney Termination Requirements; 2-10-3 Rule - Vermont Castings MONTPELIER II MONTP-II-CB Installation Manual

Montpelier ii wood insert
Table of Contents

Advertisement

B. Chimney Termination Requirements
Follow manufacturer's instructions for clearance, securing
flashing and terminating the chimney (Figure 13.1 &
Figure 13.2).
Must have an approved and Listed cap.
Must not be located where it will become plugged by
snow or other material.
Must terminate at least 3 feet (91cm) above the roof
and at least 2 feet (61cm) above any portion of the
roof within 10 feet (305cm).
Must be located away from trees or other structures.
NOTICE:
• Chimney performance may vary.
• Trees, buildings, roof lines and wind conditions
affect performance.
• Chimney height may need adjustment if smoking or
overdraft occurs.
Pitched Roof
3 ft (91 cm)
Minimum
Figure 4.2
Flat Roof
Figure 4.3
13
2 ft (61 cm)
10 ft (305 cm) To Nearest Roofline
10 ft. (305cm) or more
Wall or Parapet
3 ft. (91cm) Minimum
NOTICE: Locating the appliance in a basement or in
a location of considerable air movement can cause
intermittent smoke spillage from appliance. Do not locate
appliance near.
• Frequently open doors.
• Central heat outlets or returns.
C. 2-10-3 Rule
These are safety requirements and are not meant to
assure proper flue draft.
This appliance is made with a 6 inch (152mm) diameter
chimney connector as the flue collar on the unit.
• Changing the diameter of the chimney can affect draft
and cause poor performance.
• It is not recommended to use offsets and elbows at
altitudes above 4000 feet above sea level and or when
there are other factors that affect flue draft.
Less than 10 ft (305 cm)
2 ft (61 cm)
3 ft. (91cm) Minimum
7101-802G
3 ft (91 cm)
Minimum
Less than 10 ft. (305cm)
2 ft. (61cm) Minimum
07/20

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Montpelier ii montp-ii-bm

Table of Contents