Bard W24G4 Installation Instructions Manual page 12

Wall mounted gas/electric
Table of Contents

Advertisement

3. Locate and mark lag bolt locations and bottom
mounting bracket location.
4. Mount bottom mounting bracket.
5. Hook top rain flashing under back bend of top.
Top rain flashing is shipped secured to the right
side of the back.
6. Position unit in opening and secure with 5/16"
lag bolts; use 7/8" diameter flat washers on the
lag bolts. Use lag bolts long enough to support
the unit's weight when mounted to the structure.
This length may be dependent on the type of
construction.
7. Secure rain flashing to wall and caulk across entire
length of top (see Figures 2A and 2B).
8. On side-by-side installations, maintain a minimum of
20" clearance on right side to allow access to control
panel and burner compartment, and to allow proper
airflow to the outdoor coil. Additional clearance may
be required to meet local or national codes.
Manual 2100-721B
Page
12 of 54

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents