2 Engineering
2.2

Commissioning the drive

The parameterization of the SINAMICS G120P is done with the SINAMICS G120
Basic Operator Panel 2 (BOP-2). With the BOP you can access all relevant
parameters of the actuator and make settings. The parameterization in this
application example is divided into the following steps:
Step 1: Carry out quick commissioning of the drive
Step 2: Parameterization of the drive's mode of operation
Note
A detailed description of the commissioning of the SINAMICS G120P drive can
be found in the operating instructions:
https://support.industry.siemens.com/cs/ww/en/view/109757231
2.2.1

Step 1: Quick commissioning

A quick commissioning must be carried out before parameterizing the drive.
Selected parameters of the drive are set to defined values.
Requirements:
The supply voltage is switched on.
The BOP-2 displays setpoints and actual values (after switching on the
actuator).
Make the factory settings for the drive
Table 2-3: Factory setting
Step
1.
2.
3.
4.
5.
6.
Enter motor data
The inverter is factory-set to an asynchronous motor suitable for the rated power of
the power module. Check and, if necessary, change the motor data parameters.
The data of the motor you are using can be found on the nameplate.
Pump with SINAMICS G120P
Entry-ID: 109759888,
V1.0.1,
Press the ESC key on the BOP-2.
Press one of the arrow keys until the BOP-2 displays the SETUP menu.
To start the quick commissioning, press the OK key in the "SETUP" menu.
"RESET" appears on the display. Press the OK button.
Use an arrow key to change the display: NO → YES
Press the OK button. (The drive carries out a factory setting)
09/2019