Mounting / Installation
5
Preparation
28 | 54
–
Break or cut open the openings for feeding though cables in the cable
gripper.
–
Screw the cable gripper into the housing.
4. Seal off cable entry openings that are not required.
a The manual call point FDM223H/FDM224H is now prepared for mounting.
Figure 8: Opening the door of manual call points FDM223H and FDM224H
007002_k_en_--