Storage; Overview; Storing The Machine After The Operation; Installation - Wega ALE Series Use And Maintenance Manual

Table of Contents

Advertisement

4.

STORAGE

Overview

4.1
In the waiting period prior to installation, the ma-
chine must be stored by the Manufacturer or Authorized
Distributor.
Storing the machine after the
4.2
operation
If the machine is no longer used after a certain period
of operation, store in the following conditions:
Unplug the machine from the water and power mains;
Empty all the internal circuits of the water.
Store the machine taking the following precautions:
Store closed;
Protect from shocks and stresses;
Avoid contact with corrosive substances.
The machine was designed and built to operate in
environments with the following characteristics:
Room temperature:
Max relative humidity:
Any variation in these characteristics may decrease
the average life of some components of the machine.
Typical examples:
ambient temperature: premature degrading of the
engines.
RH: premature degrading of seals and electronics.
If the environmental characteristics are significantly different
from those listed, contact the MANUFACTURER before they become
a source of problems.
After storage, before starting up the machine it is necessary to
fully inspect the equipment.
TECHNICIANS manual
+5 + 40 °C
50% (at 40°C)
5.

INSTALLATION

Safety precautions

5.1
Installation must always and exclusively be performed by qualified
personnel and in compliance with applicable safety and health
regulations.
This appliance is to be considered completely safe only when it is
connected to an efficient earthing system which is in compliance
with safety standards.
The electric system must be equipped with a suitable GFCI (circuit
breaker). It is important to have these requirements checked. If in
doubt, have the system carefully checked by qualified personnel.
The manufacturer cannot be considered responsible for any
damage caused by an inadequate electric system.
Make sure that the supply power is enough to supply the necessary
energy for the operation of the machine.
Perform the installation with the machine disconnected from the
power supply through the main switch.
Where required, the gas system must be installed with caution
and in strict compliance with local regulations.
Pay special attention to the correct injector depending on the type
of gas used. Check for gas leaks.
In case of problems during the installation and/or malfunction,
turn off the machine and contact the Manufacturer.
The components used during installation must ensure that
the hygiene and safety requirements initially provided for the
appliance are still met. These are met by using original spare
parts only.
The following residual risks are present during the
installation of the machine and cannot be eliminated:
Electrical hazard
Equipotential hazard
Danger of high temperature
Explosion hazard
Prohibition to operate with moving parts
19
68
of

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents