10. Installation
Double installation
D
<Front view>
▶ For the double installation, service space is required for the front, rear, and sides of the product. For the size of the
service space, refer to the service space size of single, module or continuous installation.
▶ Clear enough space for D (space between outdoor units), so that water pipes connected to outdoor units does not
block the front side of the outdoor units next to it.
Base construction and installation of the outdoor unit
ꞏ Make sure to remove the wooden pallet before installing the outdoor unit. If you do not remove the wooden
pallet, there is risk of fire during welding the pipes. If the outdoor unit is installed with wooden pallet on, and
CAUTION
it was used for long period time, wooden palette may break and cause electrical hazard or high pressure may
damage the pipes.
※ Fix an outdoor unit firmly on the base ground with anchor bolts.
※ Manufacturer is not responsible for the damage occurred by not following the installation standards.
1. Make sure that the height of the base ground is 150 mm or higher to protect the outdoor unit from rain water
or other external conditions. Also, install a draining pit around the base ground and connect the drain pipe to the
drainage.
2. Considering the vibration and weight of the outdoor unit, strength of the base ground must be strong to prevent
noise and the top surface of it should be flat.
3. Base ground should be 1.5 times larger than the bottom of the outdoor unit.
4. Outdoor unit must be fixed firmly so that it can withstand the wind speed of 30 m/s. If you cannot fix the outdoor
unit on the base ground, fix it by side or use extra structure.
5. In heating operation, defrost water may form so you must really care about the drainage and waterproofing the
floor. To prevent defrost water from stagnating or freezing, construct a drainage with over 1/50 slope. (Ice may
form on the floor in winter time.)
6. It is necessary to add wire mesh or steel bar during concrete construction for the base ground to prevent damages
or cracks.
46
(Unit : mm)
H beam
support
Service
space