Monthly Maintenance Procedure; Performing An O-Ring Leakage Test - Qiagen BioRobot M48 User Manual

Table of Contents

Advertisement

6.3

Monthly maintenance procedure

Perform the monthly maintenance procedure as follows:
1. Perform the daily and weekly maintenance procedures
2. Perform an O-ring leakage test (see below). If necessary,
6.3.1

Performing an O-ring leakage test

An O-ring leakage test is required during the monthly
maintenance procedure.
1. Switch on the BioRobot M48 and open the QIAsoft M
2. Select "Manual Operation/O-ring Leakage Test".
3. Close the workstation door and click "OK".
4. Close the workstation door and click "OK".
5. If you observed dripping of the disposable tips, replace
QIAGEN BioRobot M48 01/2003
(see pages 6-2 and 6-4, respectively).
replace the O-rings (see page 6-6).
software (Section 5.2.1, page 5-2).
A dialog box with instructions appears. You will need to:
-
Open the workstation door
-
Load the worktable according to the dialog box
(6 disposable tips and a large reagent container with
10 ml water are required)
The pipettor head picks up the tips, aspirates the water,
and moves up.
Another dialog box with instructions appears. You will
need to:
-
Open the workstation door
-
Check whether the disposable tips drip within a
10 min period
The pipettor head dispenses the water back into the large
reagent container and ejects the disposable tips into the
tip rack.
The pipettor head then moves to its home position.
the O-rings (page 6-6).
Preventive Maintenance
6-7

Advertisement

Table of Contents
loading

Table of Contents