FBD120/180/200/220 SECTIONAL GARAGE DOOR OPENER
5. Installation and adjustment
Step 1
Before installation of the door opener, the door should be carefully checked for
being kept well balance.
The door must be in good working order. Open and close the door manually,
make sure the door can be moved smoothly.
Check if there is a solid frame in the wall in the center of the door.
Close the door.
Locate the centre of the door
Fit in the drive rail least 40mm space above the highest point of the garage
door. There should be a minimum clearance of 80mm between the drive rail
and the ceiling.
Ensure the header bracket is being installed in the centre position.
Sectional door
Ceiling
Garage door
Fig.2
Highest point
Fig.3
6
Highest point
Tilt door