Installation And Adjustment - TdA FBD120 Installation And User Manual

Sectional garage door opener
Table of Contents

Advertisement

FBD120/180/200/220 SECTIONAL GARAGE DOOR OPENER

5. Installation and adjustment

Step 1
 Before installation of the door opener, the door should be carefully checked for
being kept well balance.
 The door must be in good working order. Open and close the door manually,
make sure the door can be moved smoothly.
 Check if there is a solid frame in the wall in the center of the door.
 Close the door.
 Locate the centre of the door
 Fit in the drive rail least 40mm space above the highest point of the garage
door. There should be a minimum clearance of 80mm between the drive rail
and the ceiling.
 Ensure the header bracket is being installed in the centre position.
Sectional door
Ceiling
Garage door
Fig.2
Highest point
Fig.3
6
Highest point
Tilt door

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fbd180Fbd200Fbd220

Table of Contents