Figure 5b
Create a mixture of equal parts soap and water. Apply to all the joints of the pipe fittings from the gas
supply pipe to the burner. Turn on the gas supply valve for no longer than 3-5 seconds. If bubbles
appear in the soap solution applied to the joints, there is a leak. Turn off the gas supply valve and
tighten those fittings. Repeat the above procedure until no bubbles appear in the soap solution.
Remember to test all joints.
WARNING: Do not use an open flame to test for leaks!
NOTE: Always perform a leak test any time the appliance has been moved or disconnected from
the gas supply line.
1. Open the bag of Silica Sand and spread it
evenly across the Burner Pan, to the top, as
shown in Figure 6. You may overflow the front
and sides of the pan to cover the entire pan
and connecting hardware. NOTE: Sand is for
use with Natural Gas ONLY! Vermiculite or
Lava Rock must be used in place of Sand for
Propane Gas. See Propane Conversion Kit
Manual for details.
2. Next, open the bag of Glowing Embers and
place them on top of the Silica Sand, evenly
across the Burner Pan. Be sure to separate
the Glowing Embers into very small pieces
before placing them onto the Silica Sand.
20003889
Figure 5c
CFM159
Leak Test Procedures
Adding Pan Material
Figure 6
CFM150
Glowing
Embers
Silica
Sand
Glowing
Embers
Lava Rock
LG370
7