Connecting CTs to the Inverter
See
Figure
5-8. Connect CTs to the inverter using
a RJ-45 connector and Category 5 (Cat 5) Ethernet
cable.
CT input jack (H) is a double-stacked RJ-45 jack.
Either the top or bottom jack may be used.
NOTE: Connect CTs to the CT input jack in the middle of
the wiring compartment. Do not connect CTs to the
Ethernet jack. Do not connect the Internet to the CT input
jack.
See
Generac
Compartment
for jack locations.
:
I
H
Figure 5-8. Accessory Ports
H
CTs RJ-45 jack
I
ATS (Automatic Transfer Switch) RJ-45 jack
J
REbus Beacon USB-B
K
Authorized Generac personnel only
L
External safety shutdown switch terminals
See
Figure
5-9. Connect CT leads to RJ-45
Breakout Adapter (M), using the wire coding shown
in
Table 5-8: CT
Pinout.
Figure 5-9. RJ-45 Breakout Adapter
Setpoint
Behavior
C
Overrides automatic CT detection.
When set to 0, the inverter automatically detects the CTs number and
direction of CTs.
A value of 1 assumes a specific orientation and direction of CTs.
CTTurnsRatio
Turns ratio of the CTs installed.
Default turns ratio of 1500 is compatible with included clamp type CT's
If installation restriction requires larger accessory CT's, set point shall be
adjusted to 3000.
Installation Manual for Generac PWRCell Inverter
PWRcell
Inverter
Wiring
L
K
J
010001
M
010002
Table 5-9. CT Setpoints
NOTE: RJ-45 Breakout Adapter is included in the
Generac PWRcell Kit.
NOTE: If the RJ-45 Breakout Adapter is not available,
the CT leads can be wired to a Cat 5 cable.
Table 5-8. CT Pinout
Wire Color
Pin
(T-568A)
1
White/Green
2
Green
3
White/Orange
4
Blue
5
White/Blue
6
Orange
7
White/Brown
8
Brown
CT Calibration
Install CTs before powering ON the inverter.
The inverter automatically detects and calibrates
CTs when turned ON.
Once CTs are detected and calibrated, a utility pole
symbol will appear on the lower right corner of the
home screen power flow diagram.
If
manual
CT
calibration
CalOverride to 1. The CalOverride setpoint is
accessible through the Mod. Settings menu via the
inverter device page. See
information.
– CT1 must be connected to Line 1.
– CT2 must be connected to Line 2.
– CT3 must be connected to line 3 (for three phase
applications).
– All CTs must be pointed such that positive cur-
rent defined by the arrow of the CT is pointed
towards the grid.
Electrical Connections
Wire Color
Value
(T-568B)
White/Orange
CT3+
Orange
CT3-
White/Green
CT2+
Blue
CT1+
White/Blue
CT1-
Green
CT2-
White/Brown
Not Used
Brown
Not Used
is
required,
set
Table 5-9
for more
Default
Units
0
N/A
1500
Turns
19

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pwrcell x11400 series

Table of Contents