Vanguard VGP30B Owner's Operation And Installation Manual page 12

Vent-free propane gas heater
Table of Contents

Advertisement

INSTALLING
TO WALL
Continued
12
Marking Screw Locations
1. Tape mounting bracket to wall where heater will be located. Make sure mount-
ing bracket is level.
Maintain minimum clearances shown in Figure 7. If you can,
provide greater clearances from floor and joining wall.
2. Mark screw locations on wall (see Figure 7).
Only mark last hole on each end of mounting bracket. Insert mounting
Note:
screws through these holes only.
3. Remove tape and mounting bracket from wall.
11"
16"
Min.
Only Insert Mounting
Screws Through Last
Hole On Each End
Floor
VGP30B
Figure 7 - Mounting Bracket Clearances
Attaching Mounting Bracket To Wall
Note:
Wall anchors, mounting screws, and spacers are in hardware package. The
hardware package is provided with heater.
Attaching to wall stud method
For attaching mounting bracket to wall studs
1. Drill holes at marked locations using 9/64" drill bit.
2. Place mounting bracket onto wall. Line up last hole on each end of bracket with
holes drilled in wall.
3. Insert mounting screws through bracket and into wall studs.
4. Tighten screws until mounting bracket is firmly fastened to wall studs.
Attaching to wall anchor method
For attaching mounting bracket to hollow walls (wall areas between studs) or solid
walls (concrete or masonry)
1. Drill holes at marked locations using 5/16" drill bit. For solid walls (concrete or
masonry), drill at least 1" deep.
2. Fold wall anchor as shown in Figure 8.
3. Insert wall anchor (wings first) into hole. Tap anchor flush to wall.
WARNING
WARNING ICON
G 001
7 1/4"
Min.
32 1/2"
Min.
Figure 8 - Folding Anchor
16"
Only Insert Mounting
18 3/4"
Screws Through Last
Min.
Hole On Each End
Floor
VP2000BB
Continued
100100

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vp2000bb

Table of Contents