Clearance To Combustibles - Bard MEGA-TEC W090A Service Instructions Manual

Wall-mount air conditioner
Table of Contents

Advertisement

Clearance to Combustibles

The supply air duct flange and the first 3' of supply
air duct require a minimum of 1/4" clearance to
combustible material. See Figure 5 on page 10 for
details on opening sizes.
Width
Depth
Height
Model
(W)
(D)
(H)
All
50.64 43.19 94.22 15.81 42.67 21.82 42.74 54.24 12.27 34.95 25.98 28.65 23.73 21.48 11.68 52.24 19.48 2.73 16.00 11.49 67.65
Models
All dimensions are in inches. Dimensional drawings are not to scale.
Side Wall
Mounting
Brackets
(Built In)
U
W
26.00
1
Filter Access Panel
Heater Access Panel
21.00
Blower Access Panel
H
Control Access Panel
F
Condenser
G
Outlet Air
Hood for ECON
models only
Front View
3.75
55.00
Optional steel platform adds 3-3/4" hight to vertical
Manual 2100-705B
Page
8 of 43
FIGURE 3
Unit Dimensions
Supply
Return
A
B
C
B
E
Built In
Rain Hood
.5° Pitch
C. Breaker/
Disconnect
Access Panel
(Lockable)
Communication
Electrical
Entrance
High Voltage
Electrical
Entrance
37.18
Minimum Clearances Required to
Combustible Materials
Model
Supply Air Duct (1st 3')
All Models
F
G
I
K
L
M
Top Rain
Flashing
Shipping
Location
D
1.97
R
A
1.63
I
Ventilation Air
C
K
Side View
48.00
45.00
Removable bumper for leaving
Steel Platform on unit when
mounting unit to the wall.
TABLE 1
Cabinet
1/4"
N
O
P
R
S
E
O
1.00
Supply Air Opening
S
B
S
S
Return Air Opening
S
S
Optional
Electrical
T
Entrances
Drain
Back View
MIS-3945 B
0"
T
U
M
P
L
N

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mega-tec w120aMega-tec w150a

Table of Contents