Start-Up Checklist - Carrier Omnizone 50XCW06 Installation Start-Up And Operatig Instructions

Water-cooled indoor self-contained systems
Table of Contents

Advertisement

NOTE: To avoid injury to personnel and damage to equipment or
property when completing the procedures listed in this start-up
checklist, use good judgment, follow safe practices, and adhere to
the safety considerations/information as outlined in preceding sec-
tions of this Installation, Start-Up and Service document.
I. PRELIMINARY INFORMATION
50XCW UNIT: MODEL NO. ____________________
FIELD-INSTALLED ACCESSORIES: _____________________________________________________________________
START-UP DATE: ______________________________________
II. PRE-START-UP:
VERIFY ALL SHIPPING MATERIALS HAVE BEEN REMOVED FROM THE UNIT
IS THERE ANY SHIPPING DAMAGE? ________________ IF SO, WHERE ________________
_________________________________________________________
WILL THIS DAMAGE PREVENT UNIT START-UP?
CHECK POWER SUPPLY. DOES IT AGREE WITH UNIT?
HAS THE GROUND WIRE BEEN CONNECTED?
HAS THE CIRCUIT PROTECTION BEEN SIZED AND INSTALLED PROPERLY?
ARE THE POWER WIRES TO THE UNIT SIZED AND INSTALLED PROPERLY?
HAVE EVAPORATOR FAN AND MOTOR PULLEYS BEEN CHECKED FOR PROPER
ALIGNMENT AND DO THE FAN BELTS HAVE PROPER TENSION?
HAS CORRECT FAN ROTATION OR EVAPORATOR BEEN CONFIRMED? (Y/N) _______
VERIFY CONDENSATE DRAIN HAS BEEN INSTALLED PER INSTRUCTIONS
HAS WATER BEEN PLACED IN DRAIN PAN TO CONFIRM PROPER DRAINAGE?
ARE PROPER AIR FILTERS IN PLACE AND ARE FILTERS CLEAN?
VERIFY UNIT IS INSTALLED WITHIN LEVELING TOLERANCES
CONTROLS
HAVE THERMOSTAT CONNECTIONS BEEN MADE AND CHECKED? (Y/N) _______
ARE ALL WIRING TERMINALS (INCLUDING MAIN POWER SUPPLY) TIGHT? (Y/N) _______
PIPING
CHECK WATER CONNECTIONS
CHECK THAT CIRCULATING PUMP IS ON AND RUNNING (Y/N) _______
LOCATE, REPAIR, AND REPORT ANY LEAKS
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Catalog No. 04-53500265-01

START-UP CHECKLIST

(Fill out this form on start up and file in job folder)
(Y/N) _______
Printed in U.S.A.
Form 50XCW-8SI
SERIAL NO. ____________________
(Y/N) _______
(Y/N) _______
(Y/N) _______
(Y/N) _______
(Y/N) _______
(Y/N) _______
Pg CL-1
(Y/N) _______
(Y/N) _______
(Y/N) _______
(Y/N) _______
11-19
Replaces: 50XCW-7SI

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents