Checking And Adjusting Forward Drive Belt Tension; Replacement Belt Information - Troy-Bilt Super Bronco Operator's Manual

Rear-tine tiller
Hide thumbs Also See for Super Bronco:
Table of Contents

Advertisement

FORWARD
Figure 5-3: Install tines so that cutting edge of tines enter soil first when tiller moves forward.
CHECKING AND ADJUSTING
FORWARD DRIVE BELT TENSION
It is important to maintain correct tension
on the forward drive belt. A loose belt will
cause the tines and wheels to slow down —
or stop completely — even though the en-
gine is running at full speed. A too tight
belt can result in unintentional tine move-
ment when the clutch bail is in the Neutral
(released) position.
• Check belt tension after the first two
hours of break-in operation and after every
10 operating hours.
• At the end of each tilling season, check
the belt for cracks, cuts or frayed edges
and replace it as soon as possible.
To Check Forward Belt Tension:
1. Stop engine, wait for all parts to stop
moving and disconnect spark plug wire.
2. With the Forward Clutch Bail in an open
(released) position, measure and note the
overall length of the cable spring (A, Figure
5-4) by measuring from the outermost coil
to the outermost coil.
3. Squeeze the Forward Clutch Bail against
the handlebar (see Figure 5-4) and re-
measure the length of the coils. The belt
WARNING:
Before inspecting, cleaning or servicing the machine, shut off engine, wait for all
moving parts to come to a complete stop, disconnect spark plug wire and move wire away from
spark plug. Failure to follow these instructions can result in serious personal injury or property
damage.
C
A
tension is correct if this second measure-
ment is between 1/6" -to- 3/16" longer than
the first measurement.
4. If the spring is too short (less than
1/16"), the tension is too loose. If the
spring is too long (more than 3/16"), the
tension is too tight.
5. To adjust the length of the spring:
a. Release the Forward Clutch Bail.
B
Figure 5-4: To check forward belt tension, take two measurements of the
overall length of the coils in the spring — first with the clutch bail open,
then with the clutch bail closed against the handlebar.
D
B
A
C
D
Hold bail against handlebar while
taking second measurement of spring
19
b. Unthread the hex nut (C, Figure 5-4)
halfway up the adjustment screw (D).
c. Unhook the top of the spring from the
Forward Clutch Bail.
d. Use pliers to prevent the adjuster (B)
from turning and turn the slotted screw lo-
cated inside the spring clockwise (viewed
from operator's position) to increase ten-
sion on the spring. Turn the screw counter-
clockwise to decrease tension. Once
adjusted, reattach the spring to the For-
ward Clutch Bail.
e. Repeat Steps 2 and 3 to re-measure the
length of the spring. When the second mea-
surement is between 1/16" -to- 3/16" longer
than the first measurement, retighten the hex
nut (C) against the top of the adjuster (B).

Replacement Belt Information

If the drive belt needs to be replaced, see
your local authorized dealer or refer to the
Parts List for ordering information. Use
only a factory-authorized belt as an "over-
the-counter" belt may not perform satis-
factorily. The procedure requires average
mechanical ability and commonly available
tools.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pro-line

Table of Contents