Alcatel OmniSwitch 7700 Hardware User's Manual page 76

Hide thumbs Also See for OmniSwitch 7700:
Table of Contents

Advertisement

Setting Up Power over Ethernet Hardware
2
Attach the flanges to the power shelf using the Phillips-head screws provided. Be sure to tighten each
of the screws firmly using a Phillips screwdriver.
3
After both rack-mount flanges are secured to the unit, mark the holes on the rack where the power shelf
is to be installed.
4
Lift and position the power shelf until the rack-mount flanges are flush with the rack post.
5
Align the holes in the flanges with the rack holes that were marked in step 3.
6
Once the holes are aligned, insert a rack mount screw (not provided) through the bottom hole of each
flange. Tighten both screws until they are secure.
D
P E
S .
U IP
1
R D
E Q
C O
LY
E
P P
P LY
T R
IC
S U
E C
E R
O W
IT .
U N
U T
S
P E
L E
O U
S
O N
R D
N IR
Z T
V E
H E
R E
N C
R A
S
O N
N
R D
IO
A T
E
C O
N T
IR
N .
M E
F A
D E
IO
A T
N T
A R
E P
Note. Be sure to install the screws in the bottom hole of each flange, as shown, before proceeding.
7
Once the screws at the bottom of each flange are secure, install the remaining two rack mount screws.
Be sure that all screws are securely tightened.
page 3-12
3
2
OmniSwitch 7700/7800 Hardware Users Guide
Installing and Managing Power over Ethernet (PoE)
4
April 2005

Advertisement

Table of Contents
loading

This manual is also suitable for:

Omniswitch 7800

Table of Contents