Final Procedures - Triax CSE 2800 Assembly Instruction Manual

Table of Contents

Advertisement

8
f
i n a l
After installing the head-end station, upgrading accessories or installing mod-
ules it is necessary to tighten all cable connections, F terminals and cover
screws in order to maintain compliance with current EMC regulations.
• Securely tighten the cable connections (F connector) using an open-ended
spanner (spanner width 11 mm).
• Position the breakthroughs in the base plate above the fastening screws
(fig. 26).
• Push the base plate in direction of the arrow and lock it with the locking
screw
• Tighten the fastening screws
• Tighten the nuts of retrofitted F terminals if applicable.
• Hang the front cover on the fastening screws
• Secure the front cover using the 4 locking screws
which were supplied for the initial installation.
• Tighten the fastening screws
pro C e d u res
2
2
(fig. 26).
1
2
1
2
1
Fig. 26
.
2
2
(page 10, fig. 6).
2
1
2
1
2
Abb. 27
- 23 -
2
(page 10, fig. 6).
(page 10, fig. 6)
1
1
2
CSE 2800

Advertisement

Table of Contents
loading

Table of Contents