500-SHEET FINISHER INSTALLATION
3.13.2 INSTALLATION PROCEDURE
[A]
[B]
B442I103.WMF
CAUTION
Unplug the main machine power cord before starting the following
procedure.
NOTE: Before installing the 500-sheet finisher, the optional bridge unit (B417)
must be installed.
1. Unpack the finisher and remove the tapes.
2. Install the entrance guide [A].
3. Install the unit holder [B] (2 screws).
4. Install the 500-sheet finisher [C].
B022/B027
[C]
3-40
B442I104.WMF
SM