Preparing the Machine for First Use

1. Make sure all loose packaging materials have been removed from the machine.
2. Check the machine and its components for damage. If there is visible damage,
do not operate the machine! Contact your Wacker Neuson dealer immediately
for assistance.
3. Take inventory of all items included with the machine and verify that all loose
components and fasteners are accounted for.
4. Add fluids as needed and applicable, including fuel, engine oil, hydraulic oil,
retardant, and battery acid.
5. Move the machine to its operating location.
6. Connect component parts not already attached.
5.2

Break-in Period

New engines and hydraulic components require a break-in period to ensure
maximum efficiency. During the break-in period, the internal components of the
engine wear slightly and develop a tight seal.
The engine and hydraulics in this machine have a 50-hour break-in period.
Operating
Follow the recommendations below while operating the machine during the break-
during the
in period.
break-in
■ Allow the engine to warm up completely before operating the machine.
period
■ Use only for medium-duty concrete load conditions. Postpone heavy-duty
concrete loads until the break-in period has elapsed.
5.3

Position of the Operator

Safe and efficient use of this machine is the operator's responsibility. Full control of
the machine is not possible unless the operator maintains the proper working
position at all times.
While operating this machine the operator must:
■ Be seated in the operator's seat facing forward
■ Have both feet on the control deck
■ Have both hands on the controls