INSTALLATION

The following illustrations are mere examples. Consider that the space available where to fit the barrier and accessories will vary depending on the area
where it is installed. It is up to the installer to find the most suitable solution.
The drawing show an operator fitted on the left.

Preliminary operations

Dig a hole for the foundation frame.
Set up the corrugated tubes needed for the wiring coming out of the junction pit.
For connecting the gearmotor we suggest using a Ø 40 mm corrugated tube, whereas for the accessories we suggest Ø 25 mm tubes.
Set up a Ø 20 mm tube for running through the release cord.
The number of tubes depends on the type of system and the accessories you are going to be fit.
Laying the anchoring plate
Set up a foundation frame that is larger than the anchoring plate.
Fit the foundation frame into the dug hole.
The foundation frame must jut out by 50 mm above ground level.
Fit an iron cage into the foundation frame to reinforce the concrete.
a