Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
Commissioning steps
Inspection steps
Maintenance steps
•
•
•
1. Opening the heat pump..................................................................................................... 51
•
2. Writing reports.................................................................................................................... 51
•
•
•
3. Checking the refrigerant circuit for leaks........................................................................ 51
•
4. Filling and venting on the primary side........................................................................... 51
•
5. Filling and venting on the secondary side....................................................................... 52
•
•
•
6. Checking expansion vessels and primary circuit/secondary circuit pressure............ 52
•
•
•
7. Checking the electrical connections for firm seating
•
8. Commissioning the system............................................................................................... 53
•
•
•
9. Checking the electronic flow switch, type IFM................................................................ 61
•
•
•
10. Fitting the top panel and front panel (closing the heat pump)...................................... 62
•
11. Instructing the system user.............................................................................................. 62
50
Page