9 - LOCATION AND MARKING OF COMPONENTS
W115 Under Assembly
A c c e s s
hatches
10 - CONNECTIONS
When following these steps, please consult the dimensional drawing and connection diagram as well as the wiring diagram found
inside the unit.
10.1 - Hydraulic connection
The hydraulic pipes must be routed through the plates provided for this purpose in the unit frame. This is either done to the right of
the unit or directly underneath.
These plates must be drilled (water circuit + condensate draining) then refitted in place before the hydraulic pipes are routed through
them.
For the W115 model, the pipes on the right are routed through a fixed insulated panel.
please see the dimensional drawing and connection diagram to locate the routing areas and connection positions
8
Filters
FMA
Humidifier (Option)
Foam panel
Electrics Box
Electric heater (option)
Cooling coil
Control valve
(cooling coil)
side plate