Installation - Kohler REVE K-20766T-S Installation Instructions Manual

Vitreous china floor-standing toilet
Hide thumbs Also See for REVE K-20766T-S:
Table of Contents

Advertisement

INSTALLATION

Way of Installation
There are two ways to install this product: in-wall tank with
frame & in-wall tank without frame
Installation For In-wall Tank With Frame
(
A. Installation of In-wall Tank
A.
1. Remove in-wall tank from packing box. Remove front cover
board or top cover board inside water tank first as shown.
Then remove support block and plug above bracket
assembly.
1.
2. Insert the frame screw and screw cap in the holes of fixing
frame, lock the frame screw with nut, then tighten the
frame screws on the fixing frame with medium Allen key as
shown in illustration A.
Tighten the bolts with medium Allen key as shown in
illustration B, and adjust the height of the adjustable
bracket according to customer's requirements.
2.
A
B
1288818-T01-B
(
)
(
)
)
-6-
In-wall Tank With Frame
(
)
Cover,Top
Plug
Cover,Top
In-wall Tank Without Frame
(
)
Cover,Front
Supporting Board
Cover,Front
Screw Base
Nut
Frame Screw
Screw Cap
Tank Frame
A
Nut
Medium Allen Key
Adjustable Bracket
B

Advertisement

Table of Contents
loading

Table of Contents