Prepare The Site - Kohler K-2593-VBW-0 Installation Manual

Freestanding vibracoustic bath with heated surface
Table of Contents

Advertisement

Available languages

Available languages

2. Prepare the Site

NOTICE: Measure your product for site preparation. Note the model number on the back side of the
bath, then visit the product page at kohler.com for additional information.
NOTICE: Do not attempt to remove the hardened casting material covering the wooden support blocks.
The casting material is required to properly position and install the bath.
IMPORTANT! To ensure a successful installation, install the bath on a level finished floor.
IMPORTANT! Make sure the subfloor offers adequate support for the bath.
Remove and discard the thin plastic film covering the support blocks.
Temporarily position the shroud in the installation location.
Verify that the shroud is level. If needed, position shims under the shroud.
Using a pencil, trace the shroud hole on the floor.
Remove the shroud and set aside.
Secure any shims to the floor.
NOTE: The drain pipe may need to be trimmed, depending on the drain installed.
Position and install a standard PVC or brass bath drain pipe. Install the drain pipe so it extends
2-1/8" (54 mm) above the finished floor.
Kohler Co.
Support Block
Shroud
Trace the
hole.
7
Drain Pipe
2-1/8"
(54 mm)
1237790-2-D

Advertisement

Table of Contents
loading

Table of Contents