Download Print this page

Kohler VOLUTE K-20610T Installation Instructions

Freestanding bath

Advertisement

Quick Links

BEFORE YOU BEGIN
BEFORE YOU BEGIN
A. Introduction
!
Please read these instructions carefully to
familiarize yourself with the required tools, materials,
and installation sequences. Follow the sections that
pertain to your particular installation. This will help
you avoid costly mistakes. In addition to proper
installation, read all operating and safety instructions.
!
All information is based on the latest product
information available at the time of publication.
Kohler Co. reserves the right to make changes in
product characteristics, packaging, or availability at
any time without notice.
!
These instructions contain important care, cleaning,
and warranty information
instructions for the consumer.
!
This product complies with GB 24977-2010.
!
This product complies with QB/T 2664-2004.
B. Installer Hazard Notification
CAUTION!! Risk of personal injury.
Cast iron baths are extremely heavy, and need
at least 5 persons for help. When installing these
products, please wear appropriate safety
equipment for the risk of clipping your fingers.
PRODUCT REQUIREMENTS
PRODUCT REQUIREMENTS
A. Summary Of Key Requirements
!
Observe all local plumbing codes.
!
Install the bath tub to a level floor.
!
Provide properly-dimensioned space.
!
Make sure the flooring offers adequate support for
your bath.
!
Observe all local plumbing and building codes.
CAUTION: Risk of product or property
damage.
Do not support the bath by the rim.
1315528-T01-C
-please leave these
SHANGHAI KOHLER LTD.,
FENG XIAN DISTRICT, SHANGHAI, CHINA
K-20610T/K-20610T-GR/K-20379T/K-20379T-GR
K-23746T/K-23746T-GR/K-23747T/K-23747T-GR
A.
!
!
!
!
GB 24977-2010
!
QB/T 2664-2004
B.
A.
!
!
!
!
!
NO.368, MIN LE ROAD,
POST CODE 201419
368
©
Copyright Kohler China Investment Co., Ltd. 2019
-1-
©
VOLUTE
INSTALLATION INSTRUCTIONS
FREESTANDING BATH
5
201419
2019

Advertisement

loading

Summary of Contents for Kohler VOLUTE K-20610T

  • Page 1 All information is based on the latest product information available at the time of publication. Kohler Co. reserves the right to make changes in product characteristics, packaging, or availability at any time without notice.
  • Page 2: Installation Requirements

    B. Product Inspection Uncrate and inspect bath for damage. Leave all materials in the crate during construction to prevent damage. Carefully open the accessory cartons and remove the components and hardware pack. If you observe any damage, do not install the bath or the accessory.
  • Page 3 INSTALL THE FREESTANDING BATH INSTALL THE FREESTANDING BATH 1. Make sure the floor is as flat as possible when choosing the position for installing the bathtub (uneven floor or tiles could affect the overall installation). Place the cast iron bathtub at a tilt or 105mm place the bottom on top (at least 2-3 people required;...
  • Page 4 3. Wood base installation and drainage pipe insertion: 4 people should stand still and raise the cast iron while another person places the wood base directly beneath the bathtub. Insert the drainage pipe pulled from the drainage into the drainage hole of the bathroom and quickly seal it with silicone.
  • Page 5: Install The Plumbing

    Kohler bathtubs. NOTICE: All housekeeping and maintenance employees must be trained in the proper cleaning of Kohler bathtubs. Post a copy of this notice in a readily- visible location. DO NOT use steel wool, wire brushes, metal scrapers or abrasive sponge pads to clean a Kohler bath tub.

This manual is also suitable for:

Volute k-20610t-grVolute k-20379tVolute k-20379t-grVolute k-23746tVolute k-23746t-grVolute k-23747t ... Show all