IBM BladeCenter Copper Pass-thru Installation Manual page 32

Table of Contents

Advertisement

3. If the BladeCenter unit is an IBM Eserver BladeCenter Type 8677 unit,
remove the acoustic-attenuation module, if one is installed, from the rear
of the unit.
Acoustic module
4. Select an I/O-module bay in which to install the copper pass-thru module.
5. Remove the filler module from the selected bay. Store the filler module for
future use.
6. If you have not already done so, touch the static-protective package that
contains the copper pass-thru module to any unpainted metal surface of
the BladeCenter unit chassis or any unpainted metal surface on any other
grounded rack component for at least two seconds.
7. Remove the copper pass-thru module from its static-protective package.
8. Make sure that the release latch on the copper pass-thru module is in the
open position (perpendicular to the module).
9. Slide the copper pass-thru module into the appropriate I/O-module bay
until it stops.
10. Push the release latch on the front of the copper pass-thru module to the
closed position.
18
IBM BladeCenter Copper Pass-thru Module: Installation Guide
Locking
handle

Advertisement

Table of Contents
loading

Table of Contents