Chapter 14 Verifying The Internal Configuration - ABB REB 551-C3*2.5 Installation And Commissioning Manual

Breaker protection and control terminal
Table of Contents

Advertisement

About this chapter
Chapter 14 Verifying the
About this chapter
The aim of this chapter is to verify that the internal communications and output signals are ac-
cording to the specification and normal protection praxis. This means that all included protection
functions must be in operation.
Verifying the internal configuration
internal
configuration
Chapter 14
123

Advertisement

Table of Contents
loading

Table of Contents