Download Print this page

Final Connections - Kohler K-17640 Installation Manual

Dual-flush two piece toilet

Advertisement

Water
Supply
Hose
Supply
Shut-Off
Valve
Supply Shut-Off Valve
Connection

9. Final Connections

Connect the supply shut-off valve to the supply hose.
Open the supply shut-off valve slowly to check for leaks. If the
connections have been properly assembled, a slight tightening of the
nuts should stop leakage.
Install the toilet seat according to the packed instructions.
Flush the toilet several times using first one push button and then the
other, and check all connections for leaks. Verify proper operation.
Periodically check for leaks for several days following the
installation.
Adjustments
Adjust the water level in the tank by squeezing and sliding the
C-clip on the float rod.
To raise the water level, slide the C-clip up.
To lower the water level, slide the C-clip down.
Kohler Co.
C-Clip
Fill
Valve
Bottom Inlet
Adjust the Water Level
9
Waterline
Flush
Valve
1066117-X2-B

Advertisement

loading

This manual is also suitable for:

K-11494