Installation, connecting up, commissioning

3.3 Note on operation

Requirement: Configuration prior to commissioning
One requirement for the commissioning of the module is the completeness of the STEP 7
project data (see below, step 5).
Installing, connecting up and commissioning the module
Note
Connection with power off
Only wire up the S7-1200 with the power turned off.
Table 3- 2
Procedure for installation and connecting up
Step
What to do
1
Mount the CP on the DIN rail and connect it to
the module to its right.
2
Secure the DIN rail.
3
Connect the Ethernet cable to the CP.
4
Turn on the power supply.
5
The remaining steps in commissioning involve
downloading the STEP 7 project data.
6
Close the front covers of the module and keep
them closed during operation.
3.3
Note on operation
NOTICE
Closing the front panels
To ensure interference-free operation, keep the front panels of the module closed during
operation.
32
Notes and explanations
Use a 35 mm DIN rail.
The slots to the left of the CPU are permitted.
You will find the pinout of the interface in the section Technical
data (Page 101).
The STEP 7 project data of the CP is transferred when you
load to the station. To load the station, connect the engineer-
ing station on which the project data is located to the Ethernet
interface of the CPU.
You will find more detailed information on loading in the follow-
ing sections of the STEP 7 information system:
"Loading project data"
"Using online and diagnostics functions"
Operating Instructions, 12/2016, C79000-G8976-C365-02