Checkout Procedure - Thermo Pride OD6FA072D48R Installation And Operation Manual

Oil fired furnace
Hide thumbs Also See for OD6FA072D48R:
Table of Contents

Advertisement

5. Checkout Procedure:

Before any system of oil piping is finally put into service, it shall be carefully tested to assure that it is
"gas-tight", as indicated in the Heating System Initial Startup section of this manual.
NOTICE: All controls on the unit should be checked for proper functioning prior
to the qualified service personnel leaving the job site. Specifically the following
should be checked:
a. With heating system in normal heating operation, check to make certain blower will start and stop
automatically under control of the indoor thermostat.
b. Check safety limit control as follows:
i.
Shut off incoming power.
ii.
Block return air opening or disconnect blower motor leads.
iii.
Restore power to appliance.
iv.
In the heating mode, set the thermostat above room temperature producing "a call for
heat".
v.
When high air temperatures are reached within the heating section, the high limit control
should act to shutdown the burner.
vi.
Shut off the electrical power.
IMPORTANT: Remove blockage or reconnect blower motor and restore power.
c. Make certain the thermostat will automatically start and stop the appliance.
NOTICE: Heat exchanger oil will burn off on initial firing creating an unpleasant
odor. To prevent this odor from occurring more than once, it is suggested the
heating section be allowed to run for 30 minutes, or until odor has dissipated.
44

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents