4.4 Booting the Switch

4.4.1 Checking before Power-On

Before powering on the QX-S5500 series, verify that:
The power cable and grounding cable are properly connected.
The power supply voltage is consistent with that required by the switch.
The console cable is properly connected; the terminal (which can be a PC) used for
configuration has been started; and the configuration parameters have been set.
The QX-S5500 series have the same Boot ROM display style. This document uses the
Boot ROM display of QX-S5526P as an example:
 NOTE:
The indication message indicated below is different depending on the models and the versions a little.
Software of Version 5.4.12 or later version:
Starting......
Press Ctrl-B to enter Boot Menu... 1
Software of Version 5.4.8 or previous version:
Starting......
Press Ctrl-B to enter Boot Menu... 1
***********************************************************
*
*
NEC QX-S5526P BOOTROM, Version 721
*
***********************************************************
Copyright (c) 2004-2013 NEC Corporation. All rights reserved.
Creation date
: Nov 12 2013, 01:59:13
CPU Clock Speed : 533MHz
BUS Clock Speed : 133MHz
Memory Size
: 256MB
Mac Address
: 000fe287ae08
***********************************************************
*
*
NEC QX-S5526P BOOTROM, Version 509
*
***********************************************************
Copyright (c) 2004-2009 NEC Corporation. All rights reserved.
Creation date
: Jan
CPU Clock Speed : 533MHz
BUS Clock Speed : 133MHz
Memory Size
: 256MB
Mac Address
: 000fe287b008
4 Starting and Configuring the Switch
9 2009, 10:44:09
4-5
*
*
*
*
*
*

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Qx-s5526p-dQx-s5500 seriesQx-s5550pQx-s5526t

Table of Contents