1. The boiler is supplied in four boxes, as follows:
Box 1
Cased boiler
Water and gas valves plus washers
Water fittings.
Screws and wall plugs
Wall template
Box 2
90° flue bend with clamp (not required for vertical flue)
Box 3
2.64 ft / 0.75 m flue (for side and rear flue) with terminal
2. Unpack boiler and remove loose items packs.
3. Remove the two screws at the top of the front casing. Slide it up
4.2 - clearances required for servicing (fig. 20)
13.58 in /
345 mm
4..1.
clearances requIreD For closet InstallatIon
InstructIons pertaInInG to tHe Installer

4. installation

4.1 - unpacking

30.04 in / 763 mm
Minimum
clearance of
17.71 in / 450
mm
from front of
boiler
Fig. 0
1.77 in /
45 mm
1.57 in /
40 mm
Fig. 1
8.66 in / 0 mm
17.71 in /
1.77 in / 45 mm
450 mm
9.84 in / 50 mm
1.77 in /
45 mm
19
Minimum
clearances
1.77 in / 45 mm
95.188.3 - GB