Preparing For Boiler Installation - Viessmann VITODENS 111-W Installation And Service Instructions Manual

4.7 to 35.0 kw gas condensing storage combi boiler natural gas and lpg version
Table of Contents

Advertisement

Preparing for installation

Preparing for boiler installation

Dimensions and connections
5
497
A
BC
F GH K
D
E
Fig. 1
Area for electrical connections
A
Heating flow
22 mm
B
7
Condensate drain
C
D
Heating return
22 mm
7
Filling/draining
E
Preparing the connections
Note
This boiler (IP rating: IP X4) is approved for installation
in wet rooms inside safety zone 1 in accordance with
IEEE Wiring Regulations, providing the occurrence of
hosed water can be ruled out.
Observe the IEEE Wiring Regulations.
1. Prepare the water connections. Flush the heating
system.
8
166
35
480
Gas connection
22 mm
F
7
Safety valve (DHW side)
G
Cold water
15 mm
H
7
DHW
15 mm
K
7
2. Prepare the gas connection.
3. Prepare the electrical connections.
Power cable:
A flexible cable 3 x 1.5 mm
is connected in the delivered condition.
Cables for accessories:
2-core sheathed cable min. 0.5 mm
age
2
, approx. 1.5 m long
2
for low volt-

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents