Preparing for installation
Preparing for boiler installation
Dimensions and connections
5
497
A
BC
F GH K
D
E
Fig. 1
Area for electrical connections
A
Heating flow
22 mm
B
7
Condensate drain
C
D
Heating return
22 mm
7
Filling/draining
E
Preparing the connections
Note
This boiler (IP rating: IP X4) is approved for installation
in wet rooms inside safety zone 1 in accordance with
IEEE Wiring Regulations, providing the occurrence of
hosed water can be ruled out.
Observe the IEEE Wiring Regulations.
1. Prepare the water connections. Flush the heating
system.
8
166
35
480
Gas connection
22 mm
F
7
Safety valve (DHW side)
G
Cold water
15 mm
H
7
DHW
15 mm
K
7
2. Prepare the gas connection.
3. Prepare the electrical connections.
■
Power cable:
A flexible cable 3 x 1.5 mm
is connected in the delivered condition.
Cables for accessories:
■
2-core sheathed cable min. 0.5 mm
age
2
, approx. 1.5 m long
2
for low volt-