kg
2 Fix the unit to the installation structure.
4× M12
3 Remove the slings (and screws), and dispose of them.
3.2.3

To provide drainage

Make sure that condensation water can be evacuated properly.
EPRA14~18DAV3+W1
Daikin Altherma 3 H HT
4P586100-1 – 2019.07
NOTICE
If the unit is installed in a cold climate, take adequate
measures so that the evacuated condensate CANNOT
freeze. We recommend to do the following:
▪ Insulate the drain hose.
▪ Install a drain tube heater (field supply). To connect the
drain tube heater, see
wiring on the outdoor unit" on
NOTICE
Provide at least 150  mm of free space below the unit.
Additionally, make sure the unit is positioned at least
100 mm above the expected level of snow.
Use the drain plug (with O-ring) and a hose for drainage.
1
a
b
c
3
c
a
Drain hole
b
O-ring (delivered as accessory)
c
Drain plug (delivered as accessory)
d
Hose (field supply)
NOTICE
O-ring. Make sure the O-ring is installed correctly to
prevent leakage.
3.3

To open the outdoor unit

DANGER: RISK OF ELECTROCUTION
DANGER: RISK OF BURNING
3 Unit installation
"5.3  To connect the electrical
page 11.
2
d
Installation manual
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents