Download Print this page

Sub-Zero 3 1 5 I Installation & Operation Manual page 9

Sub-zero i c e m a k e r 3 1 5 i, 3 1 5 i p installation & operation

Advertisement

S U B - Z E R O
M O D E L S 3 1 5 I
I N S TA L L AT I O N
IMPORTANT NOTE: Turn on the water supply
and check all fittings for leaks. Make sure the
electrical harness is attached to the solenoid.
Let your customer know that the ice maker will
not fill with water immediately and that the
first batch of ice produced should be
discarded. Allow 24 to 36 hours for proper ice
production.
L E V E L I N G
Level the Model 315I(P) by turning the leveling
legs counterclockwise to raise or clockwise to
lower.
To assist you in adjusting the front leveling
legs up or down, use a standard screwdriver
blade and place it in the front leveling leg to
turn.
S E C U R E T H E I C E M A K E R
To secure the ice maker, install two #8 x
head screws through each hinge. Refer to the
illustration below.
Flat Head
Screws
Securing the ice maker
A N D
3 1 5 I P
I N S T A L L A T I O N
K I C K P L AT E / G R I L L E I N S TA L L AT I O N
Once the ice maker is secured, you can install
the kickplate/grille. As shown in the illustration
below, there is some adjustment to the
mounting assembly so this decorative piece
can fit flush with the surrounding area.
DO NOT cover the kickplate/grille area.
The unit must be allowed to have ventilation
through these fins. The door panel may hang
in front of the fins, but a decorative kickplate/
grille must not cover the fins.
The kickplate/grille can be painted another
color, if you choose. Follow these easy steps:
Rough up surface to be painted with fine
grit sandpaper.
Wipe with alcohol to ensure it is clean and
1
/
" flat
2
dry.
Use an appliance or industrial grade, oil
base, high gloss enamel paint.
Kickplate / grille installation
9

Hide quick links:

Advertisement

loading

This manual is also suitable for:

31513151p