10 Start-up
10.1 Preliminary stages
Note!
Exceeding of the operating parameters!
Ensure that the operating parameters comply with the nominal values indicated on the type plate of the
dryer (voltage, frequency, air pressure, air temperature, ambient temperature etc.).
Prior to delivery, this dryer was thoroughly tested, packed and checked. Please verify the soundness of the dryer dur-
ing the initial start-up and check the perfect functioning during the first operating hours.
The initial start-up must be carried out by qualified personnel.
During the installation and operation of this device, all national regulations regarding electronics and
any other federal and state ordinances, as well as local provisions, need to be adhered to.
The operator and the user must ensure that the dryer is not operated without panels.