Fuel On Board And Checklists - Garmin 500W Series Pilot's Manual & Reference

Hide thumbs Also See for 500W Series:
Table of Contents

Advertisement

Fuel On Board and Checklists

The Instrument Panel Self-Test Page includes selec-
tions to set fuel on board (FOB) to full capacity and
access the Checklists Page. This allows you to quickly
set fuel to full limits and display any checklists you've
entered, such as start up or takeoff checklists.
To set fuel on board to full (if not provided by
sensor):
Turn the large right knob to hghlght "Set
1.
Full Fuel?".
Select "Set Full Fuel?" to set fuel on board
Press ENT and verfy that fuel on board (FOB)
2.
now matches the fuel capacty (CAP) figure.
Fuel on board s now reduced, over tme, based
on the fuel flow (FF) figure.
To view the checklists page:
Turn the large right knob to hghlght "Go To
1.
Checklsts?" and press ENT.
Turn the large right knob to select the desred
2.
checklst, then follow the steps n Secton 9 Aux
Pages - Utlty Page (Checklsts) to execute each
step n the selected checklst.
190-00357-00_0B 500W Pilot Guide7 7
(FOB) to full capacity.
Select "Go To Checklists?" to display the
Checklist Page and any available checklists. A
500W-series unit can hold up to nine check-
lists with up to 30 entries in each checklist.
3.
Once you complete the desred checklst(s),
press the small right knob to return to the
Checklsts Page. Press the small right knob
agan to return to normal operaton on the
Satellte Status or Map pages.
Once you've verified instrument operation with
the Instrument Panel Self-Test Page displayed, turn
the large right knob to highlight "OK?" and press
the ENT key.
The Satellite Status Page appears as the 500W-
series unit begins to collect satellite information. An
"Acquiring" status is displayed on the Satellite Status
Page and the signal strength of any satellites received
appears as "bar graph" readings. This is a good indica-
tion that you are receiving signals and that a position
fix is determined. Following the first-time use of your
500W-series unit, the time required for a position fix
varies — usually within two minutes.
190-00357-00 Rev B
TAKEOFF TOUR
Fuel On Board and Checklists
7
9/7/2007 3:09:51 PM

Advertisement

Table of Contents
loading

This manual is also suitable for:

400w series

Table of Contents