Setup And Adjustments - Johnson Controls NIE39 Installation Instructions Manual

Table of Contents

Advertisement

Table 9: NIE Ethernet Network Rules
Category
Line Length and Type
Terminations
1
Refer to the N1 Ethernet/IP Network Technical Bulletin (LIT-6360175) for recommended parts and part numbers.
Table 10: NIE39/NIE49 Dual Trunk Options
Trunk
Supported Dual Trunk Applications
Type
Modbus
2 RS232
M-Bus
2 RS232
Modbus
1 RS232 Modbus
and
1 RS232 M-Bus
M-Bus
1 TCP Modbus
1 RS485 M-Bus
1
To support two RS485 integrations, connect one integration to the FC Bus terminal and the other integration to an RS232C
port and add an RS-232/RS-485 converter.
2
Available to NIE3910 and NIE4910 models only.

Setup and Adjustments

Data Protection Battery
The NIE is shipped with the data protection battery installed and connected. Do not disconnect the battery for any
reason other than to replace a defective battery.
The 24 VAC supply power to the NIE charges the data protection battery. At initial startup, the battery may require
a charging period of at least 4 hours before it supports data protection if power fails. Maximum protection (up to 3
consecutive power failures without recharging time) requires a 15-hour charging period.
The data protection battery slowly loses charge when 24 VAC power is removed from the NIE. If the battery completely
loses charge, the NIE real-time clock stops.
Whenever an NIE is disconnected from 24 VAC power for over 30 days, ensure that the real-time clock is set properly
(from the user interface) and that the NIE is powered long enough to recharge the data protection battery.
Powering on the NIE
After applying 24 VAC power, the NIE requires approximately 2 minutes to start up and become operational. See
the
LED Test Sequence at Startup
Startup is complete and the NIE is operational when the (green) RUN LED is On steady and the (red) FAULT LED
is Off
(Figure
14).
Important: Wait for the NIE to complete the start-up sequence and the RUN LED to go On steady before initiating
any other action on the NIE.
NIE39/NIE49 Installation Instructions
Rules/Maximums Allowed
2,000 m (6,600 ft) for plastic/glass fiber optic with external adapter
100 m (330 ft) CAT5 cable
For 10/100 BaseT, no line terminators allowed
1
2 RS485
1
2 RS485
1 TCP Modbus
1 TCP M-Bus
1 RS232 Modbus
2
1 TCP M-Bus
section.
1
2 TCP
1 RS232
1 RS485
2 TCP
1 RS232
1 RS485
1 RS232 Modbus
1 RS485
Modbus
2
1 RS485 M-Bus
1 RS232 M-Bus
2
1 TCP Modbus
1 RS485 Modbus
1 RS232 M-Bus
1 TCP M-Bus
1 RS232
2
1 TCP
1 RS232
2
1 TCP
2
2
1 RS485
1 TCP
2
1 RS485
1 TCP
15