Jacuzzi LG72000 Installation Manual & Warranty Information page 11

Table of Contents

Advertisement

Available languages

Available languages

Installation
Undermount Installation
1. Inspect all fittings, plumbing, and control lines after inserting to ensure the
components are not damaged or disconnected.
2. Align the bathtub and connect the drain.
3. Cut deck to fit using the undermount template provided as follows:
Position the template so that the desired undermount guidelines are aligned with
the rim edge as shown.
Using a grease pencil, mark the center lines (denoted by
template.
Measure the distance from the wall, or other fixed point, to the center lines (Figure 12).
4. Affix counter to bathtub. Clean any dirt or debris from the top of the bathtub rim.
5. Turn on the power supply to the dedicated GFCI-protected circuits and check
system operation.
CAUTION! Do not use an adhesive or adhesive sealant to secure the
bathtub to the deck. If maintenance or remodeling is required, the deck
may have to be removed. Adhesive will permanently bond the bathtub to
the deck.
6. Apply a continuous bed of silicone sealant around the entire seam between the counter and the bathtub rim. Allow
sealant to cure according to manufacturer's instructions (Figure 13).
3-Wall Alcove Installation
1. Make sure framed-in alcove is of proper size per Jacuzzi dimensions, square, and
plumb; check floor for levelness (Figure 14). Rough-in should be kept to a minimum
until the unit is on the job site. Measurements may vary +0 or -¼" from original
specifications.
2. Place the tub in the alcove with the front skirt firmly on the floor. The bathtub must
be set level. To check, use a level on top of the ledges on both ends of tub and on
top of dam (Figure 15).
3. After leveling tub, mark each stud (concrete or block wall)
immediately above the back horizontal flange. Remove
tub from alcove. Measure the distance between the top of
the back horizontal flange and the bottom of the tub ledge
approximately 1½" (40 mm). Carefully mark this dimension
on the back studs (or wall), below the first mark (Figure 15 -
inset).
4. Install a Ledger Strip: Jacuzzi mandates the use of supports
under the rear ledges of bathtubs to prevent shifting. Use
horizontal ledger strip along the entire rear ledge or "I", "T"
supports in at least two places in vertical position. Nail a 1" x
3" (25 mm x 75 mm) ledger strip immediately below the lower
marks made on framing (Figure 15 - inset).
5. When fastening wood framing, pre-drill flanges with a ⅛" (5
mm) carbide bit and fasten using #8 x 1-½" (38 mm) self-
tapping sheet metal screws; to concrete/block walls use 1" (25
mm) concrete nails with nailing tool or impact.
NOTE:
Pre-drilling the nailing flanges is recommended to avoid cracking of the acrylic unit. Silicone the top of each fas-
tener to insure water tightness.
Installation Procedures (
www.jacuzzi.com
)
Continued
on template). Remove
L C
Top of
Ledger
Strip
English
Fig. 12
A
B
C
D
Counter
Template
Fig. 13
Seal with
Template
silicone sealant
Bathtub Rim
Fig. 14
Level
Fig. 15
1,50"
Ledger
Board
Page 11

Advertisement

Table of Contents
loading

Table of Contents