The commissioning procedure MUST be performed in the order shown.
st
1
Heat Pump- Master
1.
Ensure all heat pumps are turned OFF at the isolating switch.
2.
Turn ON slave 1 heat pump (2
3.
Configure heat pump address.
Whilst in the home screen on control panel, simultaneously press and hold
Up
, Down
Use Up
Press and release Enter
Change the following values as shown below.
Menu
Slave 1
Display
17
address
setting
I/O board
02
address
trm1
32
trm2
17
trm3 None
Yes
– Ok?
Press "Enter"
screen and settings will be saved.
nd
2
Heat Pump
nd
and Enter
or Down
buttons to set values.
to move curser to next line.
Slave 2
Slave 3
18
19
03
04
32
32
18
19
Yes
Yes
to confirm settings. The screen will change to the home
rd
3
Heat Pump
heat pump).
for 5 seconds to enter the setup menu.
Master
Example Screen Image of Slave 1
16
01
32
16
Yes
58
th
4
Heat Pump