Connection Of The Siwarex Db; Connect Siwarex Db To Siwarex Wp Electronic Weighing System And Load Cell - Siemens SIWAREX WP321 Operating Instructions Manual

Electronic weighing system
Hide thumbs Also See for SIWAREX WP321:
Table of Contents

Advertisement

Connecting

6.6 Connection of the SIWAREX DB

6.6
Connection of the SIWAREX DB
6.6.1

Connect SIWAREX DB to SIWAREX WP electronic weighing system and load cell

Procedure
1. Open the cover of the SIWAREX DB.
2. Screw in an M16 x 1.5 cable gland for each load cell.
3. Screw in an M20 x 1.5 EMC cable gland for the signal cable to the SIWAREX WP electronic
weighing system.
4. Attach the cables from SIWAREX DB to the load cell and the SIWAREX WP electronic
weighing system.
Connect the cable (Page 35)
Figure 6-10
Connect SIWAREX DB to SIWAREX WP electronic weighing system and load cell
5. Activate the terminating resistor RS-485
34
SHIELD
SENSE-
EXC-
SIGNAL-
SENSE+
EXC+
SIGNAL+
by setting both DIP switches to ON.
Operating Instructions, 08/2019, A5E33715669A-AD
SIWAREX WP321

Advertisement

Table of Contents
loading

Table of Contents