Installation Checklist
A. Water Heater Location
B. Water Supply
C. Gas Supply
D. Relief Valve
E. Venting and Combustion Air-Inlet Systems
F. Wiring
26
In a location where the vent and combustion
❑
air-inlet systems will be within the requirements
specified in this manual.
❑
Indoors and protected from freezing tempera-
tures.
❑
Proper clearance from combustible surfaces
observed and water heater not installed on car-
peted floor.
Air supply free of corrosive elements and flam-
❑
mable vapors.
❑
Water heater completely filled with water.
Air purged from water heater and piping.
❑
Gas line equipped with shut-off valve, union and
❑
sediment trap.
Approved pipe joint compound used.
❑
❑
Temperature and Pressure Relief Valve properly
installed and discharge line run to open drain.
❑
Water Heater vented separately from all other
appliances.
Flue baffle properly hung in top of water heater's
❑
flue.
❑
Blower assembly properly installed.
Proper materials and techniques used in the
❑
installation of the vent and combustion air-inlet
systems.
❑
Vent pipe properly secured to the exhaust connec-
tor of the blower assembly.
❑
Correct power supply (120 VAC).
Electrical connections tight.
❑
Provisions made to protect area from water
❑
damage.
❑
Sufficient room to service the water heater.
❑
Combustible materials, such as clothing, clean-
ing materials, rags, etc. clear of the base of the
water heater.
Flammable vapor sensor is not blocked.
❑
❑
Water connections tight and free of leaks.
Soap and water solution used to check all con-
❑
nections and fittings for possible gas leak.
Gas Company inspected installation (if required).
❑
❑
Discharge line protected from freezing.
❑
Vent and combination air-inlet systems supported
at required intervals.
Appropriate minimum clearances observed.
❑
❑
Precautions taken to prevent moisture damage
around vent termination.
Vapors from non-metalic pipe cement and
❑
primer have dissipated prior to applying electri-
cal power.
❑
Water Heater properly grounded and proper
polarity observed.