IBM 5280 Maintenance Information Manual page 111

Distributed data system, maintenance diskette drive
Hide thumbs Also See for 5280:
Table of Contents

Advertisement

Page of SY31-0602-0
As updated December 5, 1980
By
TN
L
SN20-9590
344
HEAD GAP SERVICE CHECK
1 _
Power off_
2_
Close the diskette locking lever
11-
3.
(3180) Visually check for a gap
fJ
of 3 to 4 milli-
meters
(0.118
to
0.157
inch) between the head
D
and the head load arm
II.
(51 TO)
Visually check
for a gap
fJ
of 2 to 3 millimeters
(0.079
to
0.118
inch) between the head surfaces
D
and
II.
4.
I f the gap is correct, proceed with step 5. I f the gap
is not correct, go to 345, step 3.
5.
Open the diskette locking lever.
6.
If a new head/carriage assembly was installed, go to
343.
20
Head Load Solenoid and Bail
II
a
344

Advertisement

Table of Contents
loading

Table of Contents