Statement Of Conformity; Maintenance - Greenlee FC-110 Instruction Manual

Flex clamp meters
Table of Contents

Advertisement

1.800.561.8187

Statement of Conformity

Greenlee Tools, Inc. is certified in accordance with ISO 9001 (2000) for our Quality
Management Systems.
The instrument enclosed has been checked and/or calibrated using equipment that is
traceable to the National Institute for Standards and Technology (NIST).

Maintenance

Electric shock hazard:
Before opening the battery cover or case, remove the leads from external devices and
shut off the unit.
Failure to observe this warning could result in severe injury or death.
a. The repair and service of the meter should be accomplished by Greenlee
professional maintenance personnel or authorized departments.
b. Clean the meter case by using dry cloth periodically. Grinding agent and solvent
should not be used.
Battery Installation and Replacement
This product uses 3 AAA 1.5V batteries. Please install or replace the batteries by
following the procedure below:
a. Turn off the meter and remove the probes
b. Remove the screws from the battery cover, remove the battery cover, and
replace the batteries.
c. After installing the batteries, replace the battery cover and secure with screws.
10
www.
information@itm.com
.com

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fc-118

Table of Contents