Installation And Operation Instructions; Preparing The Site, Installing The Wall Box (Rgb 324, . Rgb 326) - Extron electronics RGB 326 User Manual

Buffers for use with the rgb 320 switching interface system
Hide thumbs Also See for RGB 326:
Table of Contents

Advertisement

im Vertrieb von
Installation
Installation and Operation, cont'd
Installation and Operation Overview
To install and set up an RGB 324, RGB 326, or RGB 340 buffer,
follow these steps:
Determine the installation location.
1
Prepare the site for installation. Use the template supplied
2
in the appendix to mark the site, then cut out the
wallboard or wood.
Set the jumpers. The jumpers will be inaccessible after
3
installation.
Connect cables to the buffer for power and for audio and
4
video output. These cables will be inaccessible after
installation.
Set the front panel High Z/75 Ohm video termination
5
toggle switch.
Temporarily connect input cables and apply power to the
6
buffer, the RGB 320, and the input and output devices. See
the "Pre-installation testing/troubleshooting" section in
this manual.
Temporarily disconnect power. Remove cables as needed,
7
and mount the buffer to the wall or furniture.
Reconnect cables and power, and adjust centering and
8
levels as needed.

Installation and Operation Instructions

Preparing the site, installing the wall box
(RGB 324, RGB 326)
When selecting an installation site, choose a location that will
allow cable runs without interference, preferably next to a
2" x 4" wall stud or a structural element of the furniture. Allow
enough depth for both the wall box and the cables. You may
need to install the cables into the wall, furniture, or conduits
before installing the buffer.
The RGB 324 and RGB 326 are typically installed in a 2-gang,
3.5-inch deep, metal wall box (provided by Extron). A different
wall box, a plastic box, or no box at all can be used, as long as
the installation conforms to electrical codes and to the
interface's size requirements. Dimensional drawings and
actual-size cut-out templates are provided in appendix B.
www.camboard.de
RGB 324/326/340 • Installation and Operation
2-2
CAMBOARD Electronics
Tel. 07131 911201
Fax 07131 911203
1.
Cut out the center portion of the cut-out template, which is
provided in appendix B.
Place the template (or the wall box) against the installation
2.
surface, and mark the guidelines for the opening on the
wall or furniture.
3.
Cut out the material from the marked area with a jigsaw or
small hand saw.
4.
Check the opening size by inserting the wall box (if used)
or the interface (if no wall box is used) into the opening.
The box and/or interface should fit easily into the open-
ing. Enlarge or smooth the edges of the opening if needed.
5.
Attach the wall box to the wall stud or furniture with nails
or screws, leaving the front edge flush with the outer wall
or furniture surface, as shown in the following illustration.
Wall Stud
Screws or Nails
Cable Clamp
Installation Cable
Attaching the wall box to a wall stud
If attaching the wall box to wood, use four #8 or #10
screws or 10-penny nails. A minimum of 1/2 inch
(1.3 cm) of screw threads must penetrate the wood.
If attaching the wall box to metal studs or furniture, use
four #8 or #10 self-tapping sheet metal screws or machine
bolts with matching nuts.
6.
Feed cables through the wall box punch-out holes for
connection to the buffer, and secure them with cable
clamps to provide strain relief.
7.
Exposed cable shields (braids or foil) are potential sources
of short circuits. Trim back and/or insulate shields with
heat shrink.
ce-info@camboard.de
RGB 324/326/340 • Installation and Operation
2-3

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rgb 324Rgb 340

Table of Contents