Configuring / Programming; Overview - Siemens SIMATIC PN/BACnet LINK Operating Instructions Manual

Network transitions
Table of Contents

Advertisement

Configuring / Programming

9.1

Overview

The PN/BACnet LINK is configured in the TIA Portal. Configuration mainly comprises the
following steps:
1. Dragging PN/BACnet LINK from the HW catalog to the project
2. S7 controller and PN/BACnet LINK via PROFINET
3. Setting the PROFINET-specific parameters
4. Setting the BACnet-specific communication parameters
5. For server functionality:
– configure device object
– Configure server objects
6. For client functionality:
– Configure client
– Import BACnet device modules or create them manually
– Configure I/O object references
– If not already done for server functionality, configure device object
7. Checking and compiling the configuration
The following section contains concise descriptions of the configuring steps for the
PN/BACnet LINK:
The descriptions are not based on any specific example configurations. They are intended to
illustrate the basic method for configuring the PN/BACnet LINK and to provide a fast
introduction to configuring the PN/BACnet LINK.
The versions refer to the TIA Portal V14.
60
Operating Instructions, 10/2017, A5E39895543-AA
9
PN/BACnet LINK

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents